Trans-Sumatra Highway Sumatra East Road in Pidie, Aceh, Indonesia

The Trans-Sumatra Highway (Indonesian: Jalan Raya Trans-Sumatra) is a primary north–south road in the Indonesian island of Sumatra, 2,508.5  km longs, and connecting the north of the island in Banda Aceh to Bandar Lampung in the south, running through many major cities, traverse Medan city, Pekanbaru City, Jambi city, Palembang city on the way (sumatra east road). Upgrade work is expected to begin in March, 2013 to make it a full-fledged highway, including land acquisition.[1]

The road is a major artery, carrying transmigrants (see transmigrasi) from Java to the less densely populated Sumatra, and carrying Sumatran visitors to Jakarta and Java. The Trans-Sumatra Highway forms the whole section of the Asian Highway Network route and AH151.[2]

It consists of 4 parts, namely Jalan Raya Lintas Barat (Jalinbar), Jalan Raya Lintas Tengah (Jalinteng), Jalan Raya Lintas Timur (Jalintim), and Jalan Raya Lintas Pantai Timur.

Parts of it are being set up for controlled-access highways. The Medan–Binjai Toll Road is 17 km long and set to completed in the end of 2017.[3]

Major cities linked by the roads

The Trans-Sumatran Highway at Lubuklinggau, South Sumatra

Controlled-access highway planning

In 2012, the Indonesian government had planned to build the Trans-Sumatra toll road that connects Lampung to Aceh along 2,700 kilometers. The government will allocate Rp 150 trillion for the construction of the toll roads.[4] In the early stages, the toll road parts which is ready to be built are Padang–Sicincin Toll Road (27 km), Medan–Kuala Namu Toll Road, and Kuala Namu–Tebing Tinggi Toll Road.[5]

Toll Road progress

  • Medan–Tebing Tinggi Toll Road is divided into 2 sections:[6]
    • Section-1: Medan-Perbarakan-Kualanamu (17.8 km) has been kicked off in September 2014 and the land acquisition has reached 83 percent and construction finished reached 15 percent at end of 2014. It was predicted to be finished in June 2016.
    • Section-2: Perbarakan-Tebing Tinggi (43.9 km), the 40-year concession deal has been signed and the land acquisition has reached 81 percent. It was predicted to be finished in 2017.

See also

  • Trans-Sulawesi Highway
  • Trans-Java toll road

References

  1. ^ 'Trans-Sumatra turnpike project set to start', The Jakarta Post, November 3, 2010
  2. ^ Current Status of ASEAN Transport Network (PDF)
  3. ^ Deny, Septian (March 26, 2017). "Tol Medan-Binjai Ditargetkan Rampung Akhir 2017". liputan6.com. Retrieved March 27, 2017.
  4. ^ http://infopublik.kominfo.go.id/index.php?page=news&newsid=15929
  5. ^ Jasa Marga Studi Kelayakan Tol Trans Sumatera, Berita Satu, February 2, 2012.
  6. ^ Nadya Natahadibrata (January 6, 2015). "Jasa Marga unit to operate Medan-Tebing Tinggi toll road".

This article is copied from an article on Wikipedia® - the free encyclopedia created and edited by its online user community. The text was not checked or edited by anyone on our staff. Although the vast majority of Wikipedia® encyclopedia articles provide accurate and timely information, please do not assume the accuracy of any particular article. This article is distributed under the terms of GNU Free Documentation License.

Copyright © 2003-2025 Farlex, Inc Disclaimer
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional.