Bombardier Talent 2 at Neumarkt | |||
| Overview | |||
|---|---|---|---|
| Locale | Nuremberg | ||
| Transit type | Rapid Transit, Regional rail | ||
| Number of lines | 5 | ||
| Number of stations | 79 | ||
| Daily ridership | 40,000 | ||
| Operation | |||
| Began operation | 26 September 1987 | ||
| Operator(s) | S-Bahn Nürnberg | ||
| Technical | |||
| System length | 277,6 km | ||
| Track gauge | 1,435 mm (4 ft 8 1&fras1;2 in) (standard gauge) | ||
| Electrification | 15 kV, 16.7 Hz AC Overhead lines | ||
| |||
The Nuremberg S-Bahn (German: S-Bahn Nürnberg) is an S-Bahn network covering the region of Nuremberg, Fürth and Erlangen which was founded in 1987[1] and is now integrated in the Transport Association Region Nuremberg (Verkehrsverbund Großraum Nürnberg).[2] The full length of the five current lines is about 277,6 kilometres.[3]
The S-Bahn trains are operated by DB Regio Mittelfranken, a subsidiary of DB Regio Bayern. From December 2018 the service was due to be taken over by National Express Germany, however it withdrew from the bidding process in 25 October 2016, so the lines will continue to be operated by DB Regio Mittelfranken for the foreseeable future.[4][5][6]
The service between Fürth and Erlangen-Bruck has been marred by frequent delays and service restrictions due to the slow construction for four-track expansion. No completion date is given. The original plans for the upgrade of the Nuremberg Bamberg line to four tracks called for a new alignment of S-Bahn tracks east of the current two tracks to serve a (planned but now canceled) industrial development between Nuremberg Fürth and Erlangen. The city of Fürth sued against these plans, halting the construction and leaving sections of half built track without use. As an "interim solution" switches are planned to be installed to connect existing quadruple track sections to the legacy alignment, but a completion date is not yet known.[7][8][9]
Current lines
| Line | Route | Opened | Length | Stations |
|---|---|---|---|---|
| Bamberg** – Forchheim** – Erlangen** – Fürth (Bay) Hbf** – Nürnberg Hbf* – Lauf (links Pegnitz)* – Hersbruck (links Pegnitz)* – Hartmannshof* | 1987*–2010** | 99.6 km (61.9 mi) | 37 | |
| Roth – Schwabach – Nürnberg Hbf – Feucht – Altdorf | 1992–2004 | 49.6 km (30.8 mi) | 23 | |
| Nürnberg Hbf – Feucht – Neumarkt (Oberpf) | 1992–2010 | 36.2 km (22.5 mi) | 10 | |
| Nürnberg Hbf – Ansbach – Dombühl | 2010–2017 | 67.1 km (41.7 mi) | 16 | |
| Nürnberg Hbf – Allersberg (Rothsee) | 2020 | 25.4 km (15.8 mi) | 2 |
Rolling stock
A Class 141 in S-Bahn livery in Altdorf station (1991)
Initially the rolling stock consisted of Class 141 locomotives, later Class 143 locomotives hauling 3–4 x-Wagen coaches. Additional commuter trains were sometimes hauled by Class 111 locos. In 2007 electric multiple units of DB Class 442 (Bombardier Talent 2) were bought to supplement and replace the loco hauled units. They were to go into service in 2010, but due to technical problems they had to be sent back to the producer. Meanwhile n-Wagen sets with rented locmotives were used instead of them. The Class 442 finally went into service in 2012.[1] In late 2020 a new batch of class 1440 Alstom Coradia Continental were brought into service, replacing the last x-Wagen sets.[3][10] The Class 1440 were introduced primarily on S1 where they freed up the older class 442 sets to serve other routes. A few Class 1440 sets are also used on S4 and the new S5. As the line S5 uses the Nuremberg-Ingolstadt High Speed Line, the two units used on S5 had to be equipped with LZB.[11][12][13][14] A large scale advertisement campaign was launched to inform the public of the new rolling stock.[15]
Similar to the subway, for big events the S-Bahn often lent Class 423 trains from the Munich S-Bahn to support the rather small Nuremberg fleet.[16]
Future expansion
While there are no plans to build entirely new railway lines to add to the S-Bahn network, plans exist to upgrade and convert some existing lines to S-Bahn standards.[17] In the past some extensions of S-Bahn service have simply been "relabeling" of an existing service such as S5 which was previously known as the "Allersberg Express".[18]
Towards Würzburg
Plans include S-Bahn service along the Fürth Würzburg line which is currently one of the busiest lines in the region. In the course of de:Deutschlandtakt plans, a newly built high speed line is planned to enable travel times below 30 minutes between Nuremberg and Würzburg for high speed trains.[19][20][21] This would free up capacity on the legacy alignment for more frequent service and the introduction of a "true" S-Bahn.[22] Similar to the December 2020 switchover on "S5", there are plans to convert existing regional train service to Neustadt (Aisch) to a new "S6" with the December 2021 or the December 2022 schedule change. No changes in service pattern or additional infill stations are planned for that switchover.[23][24]
Towards Markt Erlbach and Cadolzburg
The branch lines to Cadolzburg (Rangau Railway) and Markt Erlbach (Zenn Valley Railway) are currently not electrified and electrification is often seen as precondition for S-Bahn service along those lines.[25][26][27][28] Other proposals call for the use of hydrogen powered trains or battery electric trains to replace existing diesel multiple units.[29]
Towards Gräfenberg
There are also plans to use the (largely extant but not used for passenger service) Nuremberg Ringbahn to integrate the Gräfenberg railway (which currently terminates at Nuremberg Nordost station along the Ringbahn) into the S-Bahn network.[30] One of several proposals calls for the linking of the aforementioned lines to Cadolzburg and Markt Erlbach via the Ringbahn.[31][32] However, such plans have repeatedly failed to reach the required benefit cost ratio above 1.0.
Towards Crailsheim
In December 2020 the ministers of transportation for Baden Württemberg and Bayern announced their intention to extend the S4 from its current endpoint at Dombühl across the state line to Crailsheim with a proposed entry into service 2024.[33][34][35]
Towards Neuhaus (Pegnitz) and Simmelsdorf-Hüttenbach
In the course of the planned electrification of the Nuremberg Cheb railway there are also plans to establish S-Bahn service along this line. In the course of this expansion it is also planned to offer S-Bahn service along the branch line to Simmelsdorf-Hüttenbach (Schnaittach Valley Railway)[36][37][38][39]
Towards Hilpoltstein
Local politicians repeatedly demand to electrify the 11km of the Roth Greding railway currently still in service and to extend S-Bahn service currently terminating in Roth along that line.[40] A further precondition for S-Bahn service besides electrification is the upgrade or removal of at least some of the 22 level crossings along that line.[41][42] A feasibility study ordered by the city of Hilpoltstein was released in 2020.[43][44] Costs for the necessary electrification and associated upgrades to allow speeds up to 80 km/h (instead of the current 60 km/h speed limit) were given as 24 million € in 2020.[45] In 2021 local farmers raised objections to the proposed closure of several level crossings as they were their principal users.[46]
Infill stations
Throughout the history of the S-Bahn, there have been a number of infill stations built along existing right of way to better serve certain areas. There are plans for a couple of infill stations, among them "Neumarkt Süd" (S3)[47] "Bamberg Süd" (S1)[48] and "Forchheim Süd" (S1)[49]
Interchanges with other systems
All S-Bahn stops are also served by buses.
U-Bahn S-Bahn interchanges
There are multiple interchanges with the Nuremberg U-Bahn in both Nuremberg and Fürth, including at the stations Fürth Hauptbahnhof (U1/S1), Nuremberg Hauptbahnhof (all U-Bahn and S-Bahn lines), Fürth Klinikum / Unterfarrnbach (U1/S1), Nuremberg Rothenburger Straße (U2/U3 and S1), Nürnberg-Schweinau station (S4 / U2).
Straßenbahn Nuremberg interchanges
There are interchanges between the S-Bahn and Straßenbahn Nürnberg at Nürnberg-Steinbühl station (S1, S2 / Tram lines 4 and 6) Nürnberg-Dürrenhof (S1, S2 / Tram line 5), Nürnberg-Ostring station (S1 / Tram line 5), Nürnberg-Mögeldorf station (S1 / Tram line 5), Nürnberg-Dutzendteich station (S2 / Tram line 6). Some extensions of the S-Bahn network would include interchanges to existing Tram services in the vicinity. The de:Stadt-Umland-Bahn Nürnberg–Erlangen–Herzogenaurach would include an interchange at Erlangen Hauptbahnhof if built.
See also
- Nuremberg U-Bahn
- Trams in Nuremberg
- U1 (Nuremberg U-Bahn)
- U2 (Nuremberg U-Bahn)
- U3 (Nuremberg U-Bahn)
References
- ^ a b "Die Geschichte der Nürnberger S-Bahn". Nahverkehr Franken. Retrieved 16 January 2021.
- ^ "VGN — Netz & Fahrpläne". VGN. Retrieved 16 January 2021.
- ^ a b "Fertig. Auf die Plätze. Los! Steigen Sie ein in die neue S-Bahn Nürnberg". S-Bahn Nürnberg. Retrieved 15 January 2021.
- ^ "Dienstleistungen - 619-2014". Ted — tenders electronic daily (in German). Retrieved 16 January 2021.
- ^ "Aktuelles von der S-Bahn Archiv 2015". Nahverkehr Franken (in German). Retrieved 16 January 2021.
- ^ "Aktuelles von der S-Bahn Archiv 2016". Nahverkehr Franken (in German). Retrieved 16 January 2021.
- ^ "S-Bahn: Bahn will nicht auf den Schwenk verzichten". nordbayern.de (in German).
- ^ "S-Bahn: 20-Minuten-Takt zwischen Fürth und Erlangen kommt". nordbayern.de (in German).
- ^ "Bayern investiert 20 Millionen in Fürther S-Bahn-Nadelöhr". nordbayern.de (in German).
- ^ "Aktuelles von der S-Bahn – S2: x-Wagen-Betrieb eingestellt". Nahverkehr Franken (in German). Retrieved 15 January 2021.
- ^ https://www.busundbahn.de/nachrichten/unternehmen-maerkte/detail/news/s-bahn-nuernberg-erste-neue-et-1440-im-einsatz.html
- ^ https://bahnblogstelle.net/2020/06/08/s-bahn-nuernberg-setzt-neufahrzeuge-der-baureihe-1440-ein/
- ^ https://www.mittelbayerische.de/region/nuernberg-nachrichten/neue-s-bahn-zuege-in-nuernberg-21503-art1913971.html
- ^ https://www.br.de/nachrichten/bayern/neue-s-bahn-zuege-in-nuernberg,S1JTbVQ
- ^ https://www.s-bahn-nuernberg.de/s_nuernberg/view/wir/fahrzeuge.shtml
- ^ "Die Fahrzeuge der S-Bahn Nürnberg — Triebwagen der Baureihe 423". Nahverkehr Franken (in German). Retrieved 16 January 2021.
- ^ https://www.stmb.bayern.de/med/aktuell/archiv/2020/200113s-bahn-n/
- ^ https://www.busundbahn.de/nachrichten/marketing-service/detail/news/baden-wuerttemberg-bayern-regionalbahnen-werden-zu-s-bahnen.html
- ^ https://www.spiegel.de/reise/aktuell/ice-mit-tempo-300-regierung-plant-drei-weitere-schnelltrassen-a-1258972.html
- ^ https://www.bvwp-projekte.de/schiene/2-013-V01/2-013-V01.html
- ^ https://www.nordbayern.de/region/kommt-schnellfahrtrasse-zwischen-wurzburg-und-nurnberg-1.8726543
- ^ https://www.nordbayern.de/region/neustadt-aisch/trasse-nurnberg-wurzburg-ausbau-schafft-neue-kapazitaten-1.8852022
- ^ https://www.nordbayern.de/region/neustadt-aisch/s-bahn-anschluss-von-neustadt-zu-ende-2021-1.10567627
- ^ "Neustadt bekommt S-Bahn-Halt — doch es regt sich Kritik". nordbayern.de (in German).
- ^ "Zenngrundbahn: Die Elektrifizierung lässt weiter auf sich warten". nordbayern.de (in German).
- ^ "Elektrifizierung der Zenngrundbahn – Planungen starten 2020: Stadt Langenzenn". www.langenzenn.de (in German).
- ^ "Herrmann: Zusätzliche Züge für die Zenngrundbahn — Bayerisches Staatsministerium des Innern, für Sport und Integration". www.stmi.bayern.de (in German).
- ^ "Fürth: Strom für Mittelfrankens Bahnen". donaukurier.de (in German).
- ^ "CSU fordert Investitionen in die Schiene". inFranken.de (in German).
- ^ "Wer soll Elektrifizierung der Gräfenbergbahn finanzieren?". inFranken.de (in German).
- ^ "Mit der Rangaubahn nach Gräfenberg?". nordbayern.de (in German).
- ^ https://www.nuernberg.de/imperia/md/gruene/dokumente/antraege_2013_2018/verkehrsausschuss/bericht_rangaubahn_25_09_2014.pdf
- ^ "Länderübergreifende S-Bahn-Verbindung von Nürnberg aus kommt". nordbayern.de (in German).
- ^ https://www.vgn.de/planungsprojekte/s-bahn_crailsheim
- ^ https://www.stmb.bayern.de/med/pressemitteilungen/pressearchiv/2020/149/index.php
- ^ "S-Bahn-Ausbau — Bahnausbau Nordostbayern". www.bahnausbau-nordostbayern.de (in German).
- ^ "Hunderte Kilometer: S-Bahn-Netz wächst und wächst". nordbayern.de (in German).
- ^ "Müller: "Langfristige Verkehrsplanung im Raum Nürnberg sichert zukünftige Mobilität"" (in German). Archived from the original on 20 May 2011.
- ^ https://www.vgn.de/planungsprojekte/sektor_nordost
- ^ https://www.nordbayern.de/region/roth/soll-statt-der-s-bahn-die-gredl-fahren-1.8506651
- ^ https://www.nordbayern.de/region/roth/strecke-roth-greding-wird-aus-der-gredl-eine-s-bahn-1.10748393
- ^ https://www.donaukurier.de/lokales/hilpoltstein/S-Bahn-Studie-wird-vorgestellt;art596,4647075
- ^ http://hilpoltstein.de/data/docs/amt1/s-bahn-2030/2020_08-trasse.pdf
- ^ https://www.donaukurier.de/lokales/hilpoltstein/Verkehr-Hilpoltstein-Ein-Ultramarathon-fuer-die-Opa-Eisenbahn;art596,4654137
- ^ https://www.nordbayern.de/region/roth/der-arbeitskreis-drangt-bei-s-bahn-auf-schnelles-handeln-1.10532934
- ^ https://www.nordbayern.de/region/roth/gredl-ausbau-zur-s-bahn-bauern-machen-mobil-1.10776408
- ^ "Signal steht auf S-Bahn-Halt Neumarkt Süd". nordbayern.de (in German).
- ^ "Freistaat lockt Bamberg mit S-Bahn-Halt". inFranken.de (in German).
- ^ "S-Bahn-Haltstelle Forchheim-Nord: Die Pläne liegen aus". nordbayern.de (in German).