Wikipedia

Creighton Mine

Creighton Mine
Creighton Mine.JPG
Location
Creighton Mine is located in Ontario
Creighton Mine
Creighton Mine
Location of the mine within Ontario
LocationGreater Sudbury
ProvinceOntario
CountryCanada
Coordinates46°27′50″N 81°10′29″W / 46.46389°N 81.17472°W
Production
ProductsNickel
TypeUnderground, originally open pit
History
Opened1901
Owner
CompanyVale Limited
Websitevale.com

Creighton Mine is an underground nickel mine, owned and operated by Vale (formerly known as INCO) in the city of Greater Sudbury, Ontario, Canada. It is currently the deepest nickel mine in Canada.[1]

History

Production at Creighton Mine began in 1901, and as of August 2004 there was an estimated 20 years of reserves left.

Production

In 2005 the mine produced an average of 3,755 tons per day on a 6 days per week schedule. Ore is processed off site at Vale's Clarabelle Mill.[2]

Creighton Deepening Project

Two projects are underway to allow deeper mining at Creigton Mine. The first is an $8-million, four-year diamond drill exploration program that will allow for ore tonnage to be defined down to the 10,000-foot (3,000 m) level. The second is a $48-million expansion project that will establish production ore at the 7,810-foot (2,380 m) level and bring 1.8 million tons of high-grade ore into production from 2006–2011.[3]

SNOLAB

Creighton Mine's 6,800-foot (2,100 m) level is home to one of the world's deepest underground physics laboratories. Originally excavated for the Sudbury Neutrino Observatory (SNO), it has been expanded into a general-purpose facility called SNOLAB.

See also

  • List of mines in Ontario

References

  1. ^ "The Canadian Encyclopedia". Retrieved 2007-08-20.
  2. ^ Canadian & American Mines Handbook—75th Edition. Toronto, Ontario: Business Information Group. 2006. p. 493. ISBN 0-919336-65-5.
  3. ^ Lacey, Keith (2006-08-22). "New life for Garson mine". Northern Life. Retrieved 2010-10-29. Creighton Deepening Project: Two projects are underway to allow deeper mining at Creigton Mine. The first is an $8-million, four-year diamond drill exploration program that will allow for ore tonnage to be defined down to the 10,000-foot level. The second is a $48-million expansion project that will establish production ore at the 7,810-foot level and bring 1.8 million tons of high-grade ore into production from 2006–2011.
This article is copied from an article on Wikipedia® - the free encyclopedia created and edited by its online user community. The text was not checked or edited by anyone on our staff. Although the vast majority of Wikipedia® encyclopedia articles provide accurate and timely information, please do not assume the accuracy of any particular article. This article is distributed under the terms of GNU Free Documentation License.

Copyright © 2003-2025 Farlex, Inc Disclaimer
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional.