A guaranteed maximum price (also known as GMP, not-to-exceed price, NTE, or NTX) contract is a cost-type contract (also known as an open-book contract) where the contractor is compensated for actual costs incurred plus a fixed fee subject to a ceiling price. The contractor is responsible for cost overruns, unless the GMP has been increased via formal change order (only as a result of additional scope from the client, not price overruns, errors, or omissions). Savings resulting from cost underruns are returned to the owner.

This is different from a fixed-price contract, also known as stipulated price contract [1] or lump-sum contract, where cost savings are typically retained by the contractor and essentially become additional profits.[2]

See also

  • Time and materials

References

  1. ^ Pawson, O., "Stipulated Price Contract", Canadian Consulting Engineer, accessed 14 December 2019
  2. ^ Cushman, Robert Frank (1999). Construction Law Handbook, Vol. 1. Aspen Law and Business. p. 357. ISBN 0-7355-0392-3.
This article is copied from an article on Wikipedia® - the free encyclopedia created and edited by its online user community. The text was not checked or edited by anyone on our staff. Although the vast majority of Wikipedia® encyclopedia articles provide accurate and timely information, please do not assume the accuracy of any particular article. This article is distributed under the terms of GNU Free Documentation License.

Copyright © 2003-2025 Farlex, Inc Disclaimer
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional.