Wikipedia

Big Dig (Liverpool)

The Big Dig was a collection of various civil engineering projects in Liverpool to regenerate the city.

The scheme was a ten-year plan for the city's 2008 European Capital of Culture status. The city gained a new shopping centre Liverpool One. It cost around £3bn and created 14,000 jobs and included a rationalisation of the city centre traffic network.[1]

Criticism

Implementation of the scheme was protracted and severely hampered the ability of the city to perform as a commercial centre. The cancellation of the 2007 Mathew Street Festival was directly attributed to the 'big dig'.

References

  1. ^ Liverpool City Council. "Big Dig". Archived from the original on 2 January 2007.

External links

This article is copied from an article on Wikipedia® - the free encyclopedia created and edited by its online user community. The text was not checked or edited by anyone on our staff. Although the vast majority of Wikipedia® encyclopedia articles provide accurate and timely information, please do not assume the accuracy of any particular article. This article is distributed under the terms of GNU Free Documentation License.

Copyright © 2003-2025 Farlex, Inc Disclaimer
All content on this website, including dictionary, thesaurus, literature, geography, and other reference data is for informational purposes only. This information should not be considered complete, up to date, and is not intended to be used in place of a visit, consultation, or advice of a legal, medical, or any other professional.